OR hopo : - / opposite the Entrance to the Workshops :- The stabling works, arranged Forward the elevation corresponding with the Foreman's house windows with te red on the East side of the ashench basements arranged for book houses. Five cant offices tovo are on either side of the Inner Gard. - are all enclosed within a 13 Clining "fored completed" headed-do- Legeare 41.30 Boundary - - with gates are of thou doveday pointed – de The Builder gale wall 32 ft in height. the Entrancez feet of Iron railing of this Bricking wither side of them, woodwork in the 17 six oquare clinings transoms @ 836 38742/86 65 1877 4350 55 Fr- 612 132. 72. 12 481.

Five contracts will be entered into for the erection 4 de no transmes @ 53 ho 1 and 2 workshops, H. 3 In all dons and windows both in shops offices sequers with sion baro te roof of Camell pomited fo a Dwelling House, these Contracts have been already 38 doon spanel both amount to M. Ladd will prepare the wh. I 72 4.30 cts, the contractor sides moulded @30,50 and anticipated in a for the erection [doors fetting com manneh. machinery Contract N. 4 will a experion of the offices and de of 1159 and it is be 3 d. beak flush is 1 pointed glazed panels 544 32 30 40 dwelling house complety shean a fleach folding Z 哗 and windows excepted and all fromwork and other from England) the workshops with the 3 all internal fittings, partition 8 - do Building he Foremans having been abraty recepiting of the wo for the Building the forbidation prepaded. This Contract includes house 25 25 تھے کمر Forward کی تر 200 $ 42892 36

Edit History

2026-05-19 08:09:35 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
OR hopo : - / opposite the Entrance to the Workshops :- The stabling works, arranged Forward the elevation corresponding with the Foreman's house windows with te red on the East side of the ashench basements arranged for book houses. Five cant offices tovo are on either side of the Inner Gard. - are all enclosed within a 13 Clining "fored completed" headed-do- Legeare 41.30 Boundary - - with gates are of thou doveday pointed de The Builder gale wall 32 ft in height. the Entrancez feet of Iron railing of this Bricking wither side of them, woodwork in the 17 six oquare clinings transoms @ 836 38742/86 65 1877 4350 55 Fr- 612 132. 72. 12 481. Five contracts will be entered into for the erection 4 de no transmes @ 53 ho 1 and 2 workshops, H. 3 In all dons and windows both in shops offices sequers with sion baro te roof of Camell pomited fo a Dwelling House, these Contracts have been already 38 doon spanel both amount to M. Ladd will prepare the wh. I 72 4.30 cts, the contractor sides moulded @30,50 and anticipated in a for the erection [doors fetting com manneh. machinery Contract N. 4 will a experion of the offices and de of 1159 and it is be 3 d. beak flush is 1 pointed glazed panels 544 32 30 40 dwelling house complety shean a fleach folding Z and windows excepted and all fromwork and other from England) the workshops with the 3 all internal fittings, partition 8 - do Building he Foremans having been abraty recepiting of the wo for the Building the forbidation prepaded. This Contract includes house 25 25 تھے کمر Forward کی تر 200 $ 42892 36
Baseline (Original)
Instr OR hopo : - / opposite the Entrance to the Workshops :- The stabling works, arranged Forward the elevation corresponding with the Foremans house windows with te red on the East side of the ashench basements arranged for book for book houses Five cants offices tovo are on either side of the Inner Gard. - are all enclosed within a 13 Clining "fored completed" headed-do- Legeare 41.30 Boundary - - with gates are of thou doveday pointed de The Builder gale wall 32 ft in height. the Entrancez feet of Iron railing of this Bricking wither side of them, woodwork in the 17 six oquare clinings transoms @ 836 38742/86 65 1877 4350 55 Fr- 612 132. 72. 12 481. Five contracts will be entered into for the erection 4 de no transmes @ 53 ho 1 and 2 workshops, H. 3 In all dons and windows both in shops offices sequers with sion baro te roof of Camell pomited fo a Dwelling House, these Contracts have been already 38 doon spanel both amount to M. Ladd will prepare the wh. I 72 4.30 cts, the contractor sides moulded @30,50 and anticipated in a for the erection [doors fetting com manneh. machinery Contract N. 4 will a experion of the offices and de of 1159 and it is be 3 d. beak flush is 1 pointed glazed panels 544 32 30 40 dwelling houve complety shean a fleach folding Z and windows excepted and all fromwork and other from England) the workshops with the 3 all internal fittings, partition 8 - do Building he Foremans having been abraty recepiting of the wo for the Building the forbidation prepaded. This Contract includes house 25 25 تھے کمر Forward کی تر 200 $ 42892 36 LOV
2026-05-19 08:09:35 · Baseline
View content

Instr

OR hopo

: - /

opposite the Entrance to the Workshops :-

The stabling

works,

arranged

Forward

the elevation corresponding with the Foremans house windows with te

red on the East side of the ashench basements arranged for book

for book houses

Five

cants offices

tovo are

on either side of the Inner Gard. -

are all enclosed within a 13

Clining "fored completed"

headed-do-

Legeare

41.30

Boundary - -

with

gates are of thou doveday pointed – de

The Builder gale wall 32 ft in height. the Entrancez

feet of Iron railing

of this Bricking

wither side of them,

woodwork in the

17 six oquare

clinings

transoms

@ 836

38742/86

65

1877

4350

55 Fr-

612

132.

72.

12

481.

Five contracts will be entered into for the erection 4 de no transmes @ 53

ho 1 and 2 workshops, H. 3 In all dons and windows both in shops offices sequers with sion baro te roof of Camell pomited fo

a Dwelling House, these Contracts have been already 38 doon spanel both

amount to M. Ladd will prepare the wh. I 72 4.30 cts, the contractor sides moulded @30,50

and

anticipated in a

for the erection

[doors

fetting

com

manneh.

machinery Contract N. 4 will

a experion

of the offices and de

of

1159

and it is

be

3 d. beak flush is 1 pointed glazed panels

544

32

30

40

dwelling houve complety shean a fleach folding

Z 哗

and windows excepted and all fromwork and other

from England) the workshops with the 3

all internal fittings, partition 8 - do Building

he Foremans having been abraty

recepiting of the wo for the Building

the forbidation prepaded. This Contract includes

house

25

25 تھے کمر

Forward

کی تر

200

$ 42892 36

LOV

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.